Georgios Stamatiou
University of Nottingham, Nottingham, UK
Kailash Srivastava
ABB Corporate Research, Västerås, Sweden
Muhamad Reza
ABB Corporate Research, Västerås, Sweden
Pericle Zanchetta
University of Nottingham, Nottingham, UK
Ladda ner artikelhttp://dx.doi.org/10.3384/ecp110574177Ingår i: World Renewable Energy Congress - Sweden; 8-13 May; 2011; Linköping; Sweden
Linköping Electronic Conference Proceedings 57:17, s. 4177-4184
Publicerad: 2011-11-03
ISBN: 978-91-7393-070-3
ISSN: 1650-3686 (tryckt), 1650-3740 (online)
Using High Voltage Direct Current (HVDC) transmission lines to connect offshore wind parks to the onshore power grid has been proven technically advantageous to AC solutions and more cost-effective for relatively long transmission distances (>70km).The concept of applying DC technology can be expanded to the collection grid. DC collection grid offshore wind parks can be developed only if several key components currently nonexistent are available. The technical challenges involved can result in the unpredictability of their costs. This paper investigates the effect the uncertainty of the key components’ cost can have on the overall economic performance of DC collection grid offshore wind parks. Results for a wide cost range are presented and corresponding cost boundaries which secure the economic viability of such parks were determined.
Inga referenser tillgängliga